Go Back   FlashFXP Forums > > > >

Suggestions Post suggestions for upcoming versions

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-07-2001, 07:39 AM   #1
logos
Junior Member
 
Join Date: Dec 2001
Posts: 10
Default Small addition to Schedule (tiny)

Would it be possible to enhance the scheduler so that it could be programmed to resume downloading/uploading queues with the schedule being to transfer only during out of work hours for example, so it would stop downloading during work hours + start again the next day/weekend until the queue was done?

Its a really simple change i think and would make for a far more versatile scheduler (sorta like a VCR i guess, in a way).

Thanks
logos is offline  
 

Tags
hours, schedule, scheduler, simple, work


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Changing Permissions ep2002 General Discussion 2 01-19-2005 08:56 PM


All times are GMT -5. The time now is 01:31 AM.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)