Go Back   FlashFXP Forums > > > >

Bug Reports FlashFXP 3.0 RC 3 Bug Reports

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 06-04-2004, 05:53 PM   #6
bigstar
FlashFXP Developer
FlashFXP Administrator
ioFTPD Beta Tester
 
bigstar's Avatar
 
Join Date: Oct 2001
Posts: 8,012
Default

When the schedule starts "Schedule - Starting.." unless you have a "stop at" time defined the schedule is considered complete.

The scheduled task was to start the queue at a specific time which has happened. The schedule dialog closes.

If you open the schedule dialog everything reverts back to default because you're setting a new schedule. You can't open this dialog if a schedule is in progress because the schedule dialog is already visible.

This behavior was changed because there is no point in keeping the schedule dialog open after the scheduled task has completed. Many people didn't understand why it was still open.
bigstar is offline  
 

Tags
flashfxp, schedule, scheduler, window, working


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Compare Folder Content -- SUBDIRS too? dgrrr General Discussion 1 04-04-2005 08:28 PM


All times are GMT -5. The time now is 01:05 AM.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)